Architecture, MEP Engineering and Civil Engineering Design Build

Industrial and Manufacturing

Architecture, MEP Engineering and Civil Engineering Design Build

Michael Kors Distribution Center

Project Scope included Full Ingress and Egress redesign with Secured Gate and Full Lot Control Security. Facility design project was 50,000 SQFT of Upgraded LED Title-24 Compliant Lighting for Distribution Space. Internet Sales Distribution Area included Full Pick Station Design and Engineering and Electrical and Data Upgrade. Project Cost and Schedule phase delivereables included Design Development and Final Design and Complete Engineering and CDs.

Architecture, MEP Engineering and Structural Engineering, Permit Processing - Design Build

Parker-Hannifin - Irvine, California

Aerospace Project Scope included Distribution, Loading Docks and Access Points Re-Design, New Entry Doors and Ramps for ADA Compliance and Security Protocols, New Drive Approach Design and Development. MEP engineering for Office Space, Restrooms and Break Area in Reformatted Distribution Area. Project Cost and Schedule phase delivereables included Design Development and Final Design and Complete Engineering and CDs.

MEP Engineering and System Commissioning

Jet Propulsion Laboratory (JPL)

Aerospace Project Scope included MEP Design Build to Replace two (2) Cooling Towers , MEP Design to Replace Hot Water Boiling Systems, Upgrade and Replace Air Compressors for Laboratory and MEP Engineering for a New Fan Wall Cooling System. Project Scope included Replacing 2 Cooling Towers, Design and Engineering Air Compressor for redundancy, Design and Engineering for (2) Hot Water Boilers, Design and Engineering fire the pump system. All the project was design build with our design build partners and JPL. Project Cost and Schedule phase delivereables included Design Development and Final Design and Complete Engineering and CDs.

Design Build Architectural and Engineering in Lynwood, California

Valence Surface Technologies

Design Build Architectural and Engineering for the construction documents of the new water treatment building addition. The building is a 2250 SF Pre Engineered Metal Building that will be adjunct to the existing tilt up concrete building.

In addition to the equipment engineering the city of Lynnwood did not approve the metal building design and needed to apply architectural finish so that it was more compatible with the main building.

Architectural and Engineering in Huntington Beach, Californiaa

Mission Critical Composite

Architectural and Engineering for the installation of 2 Autoclaves and a new cooling tower and nitrogen gas distribution. Worked very closely with the City of Huntington Beach Fire department and Building a Safety for approvals.